Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.12711267

- Product Categories
- Friendly Links
- home > Supply > Maoming large equipment relocation, the relocation of large equipment companies, Ante lifting
Information Name: | Maoming large equipment relocation, the relocation of large equipment companies, Ante lifting |
Published: | 2014-10-15 |
Validity: | 0 |
Specifications: | Any |
Quantity: | |
Price Description: | |
Detailed Product Description: | Ante truck crane rental company is specialized in moving factory, disassembly containers, heavy machinery lifting, shifting, positioning, packaging machinery, equipment just empty lifting, insurance agents; My company has a 8-100 tons of various types of imports of construction cranes, cars since with hanging, moving factory size trucks, flatbeds, etc. Ante lifting before removal companies in Guangzhou, Guangzhou City, Guangzhou truck mounted crane rental crane rental company in Guangzhou handling equipment relocation lifting bulky lifting handling equipment lifting turbine transformer loading removal chiller lifting handling safety and quality requirements a lifting construction, should be competent engineers and security sector to participate in the construction of all the staff technical tests and safety education. All construction personnel should seriously study the relocation of large equipment lifting solutions company, to acquire the necessary knowledge familiar with lifting safety standards and regulations, competent at their jobs and passing the examination by the relevant department. 2 participate lifting lifting personnel shall be subject to the medical department check to make sure the body healthy rate, adapt climbing operations hoisting large equipment relocation, before induction. 3 lifting operations warning area should be located obvious signs, when lifting, non unrelated persons into or through. Test should be carried out before the four official hoisting cranes, try hanging the machine to check all the forces of rigging. Found the problem should first large-scale relocation of equipment equipment back into the ground, try again after hanging troubleshooting, make sure everything works before the official lifting. Top 5 device is not fixed, not loose hooks. 6 Aerial must wear seat belts, to enter the site must wear helmets, are not allowed to throw something to the ground from a height, only the ropes were passed down, and each other. 7 lifting operations, any person shall be below the workpiece, the force rigging and other dangerous areas near the residence. Ante truck crane rental company is specialized in moving factory, disassembly containers, heavy machinery lifting, shifting, positioning, packaging machinery, equipment just empty lifting, insurance agents; My company has a 8-100 tons of various types of imports of construction cranes, cars since with hanging, moving factory size trucks, flatbeds, etc. Guangzhou Ante handling lifting crane rental company in Guangzhou City, Guangzhou, Guangzhou truck mounted crane rental company handling equipment relocation lifting bulky lifting handling equipment lifting turbine transformer loading removal chiller lifting Handling Precautions (1) Before lifting cargo, must estimate the weight of the goods (the value to be and the rated load lifting moment on, compared to a value not greater than the rated load), and the decline of rational planning to enhance cargo routes; (2) lifting spreader requirements: Crane lifting cargo sling when the (cable) angle should not be too small or too large, the maximum angle should not exceed 120 °, otherwise, the sling tension of too easily broken, the angle is too small to make large-scale relocation of equipment manufacturers sling too long, you can not achieve sufficient lifting height. (3) General operating and lifting heavy objects should be in the same side of the vehicle, in order to ensure the best operating safety perspective. (4) In order to improve the life of the crane, lifting the maximum load lifting mechanism should avoid sudden forward and reverse, in order to reduce the additional impact on the crane structure produced; ban collision hook (5) working to prevent rope off the tank; (6) Hoisting mechanism forward and pause time between 3-4 seconds reversal; (7) For multi-section telescopic boom, the telescopic steering handle is still the same handle; (8) After the work is completed should the engine off; (9) the operation is completed, to check whether the joystick automatically reset, if the handle is not in place, you want to manually restore it to the median. Maoming large equipment relocation, the relocation of large equipment companies, Ante Ante lifting by lifting available. Welcome to consult Guangzhou Ante bulky lifting Ltd. (www.anteqz.org), be sure to specify when the contact is through the "Business Alliance members" see, thank you! Contact: European Cheung Chan |
Admin>>>
You are the 35116 visitor
Copyright © GuangDong ICP No. 10089450, Guangzhou Ante bulky lifting Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 35116 visitor
Copyright © GuangDong ICP No. 10089450, Guangzhou Ante bulky lifting Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility